Qualitative Risk Analysis

  • Identification of hazards and causes
  • Description of consequences
  • Evaluation of risks
  • Identification of existing preventive measures
  • Definition of risk reduction measures
  • Assignment of responsibilities
  • Preparation of Risk Register
  • Preparation of Risk Management Plan

Quantitative Risk Analysis

  • Calculation of risked cost and duration for planned drilling operations
  • Evaluation and selection of alternative technical solutions
  • Preparation of prevention and mitigation plans for the reduction of both duration and cost.

“An Innovative Tool on a Probabilistic Approach related to the
Well Construction Costs and Times Estimation” (SPE 121837)