Well Integrity is the “application of technical, operational and organisational solutions to reduce risk of uncontrolled release of formation fluids throughout the life cycle of a well” (Norsok Standard D-010).
ProEnergy offers a Well Integrity Assessment service for production and injection wells, including:
- Collection of well construction data (casing, cement, completion, wellhead, etc.)
- Collection of operational/production data (involved fluids, temperatures, pressures, flow rates, etc.)
- Creation of a customized database containing all collected data
- Stress Analysis calculations to verify resistance to expected maximum loads
- Collection of possible annulus/inter-casing pressures at wellhead
- Calculation of maximum allowable pressures for each annulus/inter-casing
- Preparation of suitable investigation programmes (draw down-build up tests, samples analyses, …)
- Analysis of possible causes of loss of integrity and proposal of remedial actions
- Definition of a suitable monitoring programme for wells with annulus/inter-casing pressures
- Final Report on Well Integrity Status
The above service can be provided by ProEnergy also as “Independent Third Party”.
“Management of Well Integrity during Production Operations”
(Article that Paolo D’Alesio wrote for the technical Bulletin of the SPE Italian Section)







